Since
the photovoltaic of solar power generator system by weather big impact.
The absence of large energy storage devices, encountered continuous rainy
weather if the photovoltaic system generating capacity can’t meet the continuous
industrial and commercial users of electricity demand, the user may face today
with a photovoltaic power grid for tomorrow's embarrassment, will cause the
user the reverse psychology is investors need to consider.
Low
price of residential electricity, off grid solar system in the civilian
market unattractive. If the national electricity subsidies, based on the local
government and then give a certain amount of electricity or government
subsidies to install photovoltaic systems users give a certain percentage of
the initial investment subsidy, so that the civilian PV system becomes as
profitable. Based on our country's specific national conditions, it is also
facing a lot of problems.
In
the city the majority of people living in a dozen layers, 20 layers of the
building's residents, most of the roof space drainage air conditioning systems,
solar generator hot water systems and other ancillary facilities to
occupy the property, can really be used to PV very limited. Investors need to
spend a lot of manpower and resources to find the idle roof, potentially
increasing construction costs. Even found a suitable roof, because it belongs
to the public area, you want to install photovoltaic systems on the roof
requires unanimous consent of all the owners. The national grid solar system
in a distributed power plant projects receiving the application, the applicant
must also required to provide identity cards, real estate license and other
materials; occupy public areas to provide proof of the consent of other owners,
property, neighborhood. So, we want in China's urban residents roof
construction of photovoltaic power plants, regardless of the owner or a third
party builder, his public relations capacity requirements are very high.
In
our countryside, although abundant resources and household roof house roof
farmers call the shots, but the problem may be facing more. Less electricity and
off grid solar system infrastructure is poor, the farmers can’t afford
the high initial investment. Resulting in less power installed capacity is
limited; resulting in poor grid infrastructure requires additional substantial
investment; farmers can’t afford, and if the introduction of outside investors,
the roof was dispersed in every household, administrative costs will be high.
Indeed
the investors and investment experience will encounter obstacles far more than
those listed above, there are many obstacles that investors can’t control or can’t
be expected, national policies are also difficult to solve.
The
issue of Technical and institutional of photovoltaic grid solar system
Now
China has built large-scale ground photovoltaic power plants and generally
facing difficult network problems. One reason is that large-scale ground
photovoltaic power plants mainly in the construction of the western desert
region in China. These areas far from load centers, economic underdevelopment,
low industrial and population, not much electricity, hydropower, wind power
already can’t consumptive. So often it requires long-distance transmission to
the photovoltaic transported to the load centers. However, due to the local
grid infrastructure is extremely inadequate, and to network, many photovoltaic solar
energy storage plant builders have additional investment to spend money to
purchase and installation of network equipment, and even the construction of
transmission lines and substations, and net amount of money reduce the cost of
power station construction economy.
Grid
PV power plant has been due to receive restricted grid capacity and other
factors, resulting in brownouts have occurred, plus subsidies paid in time,
have built a lot of PV power plant is idle; there is a reason that the rv
solar power company cumbersome and network processes, photovoltaic power
plant builders to spend at least six months to a year, photovoltaic power
plants to the grid. And around the grid company will continue to transform the
requirements, but also to the cost of photovoltaic power plant in an unexpected
layers accumulated. Since the grid company can determine whether a photovoltaic
power station and the network, so no matter whether the reasonable requirements
of the power grid company, photovoltaic power plants must meet.
PV is
mainly distributed in the eastern part of the development of grid
infrastructure is much better compared to the western region, builders do not
need to invest in the power facilities, the State solar off grid kit
Corporation also introduced support for distributed PV grid policy, but
difficult grid the problem still remains. Residents in the submission of an
application to access the distributed photovoltaic project country network
operating room, met a variety of issues, such as the need for natural persons
approved projects, the construction unit of qualification requirements, leading
to the application and the network is not through combat the enthusiasm of the
residents.
Grid
Company "difficult" PV Grid reason lies first and foremost technical
problems. Since PV affected season, weather, environment and circadian
turnover, continuity and stability of poor shortcomings, coupled with China's
power grid and other infrastructure behind, and large-scale photovoltaic power
generation grid network will interfere with the normal scheduling on the grid
safe and stable operation of the threat.
Compared
with the technical issues, the more important reason is that the portable
solar power system damaged the interests of the company. Grid standing
business point of view, it did not receive any benefit PV: First, self-occupied
photovoltaic electricity will directly lead to reduction in income once the
electricity grid. Second, in order to acquire photovoltaic grid company also
invested a lot of infrastructure, spend huge amounts of money. Third, China's
coal industry overcapacity, thermal power generation rich. And since entering
2013, coal prices decline, dramatically reducing the cost of thermal power
generation. In addition to the energy saving this reason, the power grid really
do not want cheap coal-fired power lay not, try and accept the high cost of
network problems the addition of PV.
Currently,
the power grid enterprises distributed PV "friendly" attitude mainly
forced national political pressure, but also because a small number of
distributed power generation capacity, not amount to anything, grid companies
temporarily support the fundamental interests will not pose a threat to it. If
the interests of the future large-scale application of distributed photovoltaic
power grid enterprises are still not taking into account, I believe that they
treat distributed PV change attitudes will occur immediately.
National
Grid does not support photovoltaic grid deeper reason is that China's electric solar
portable generator. In China, the monopoly power grid transmission from the
sale of electricity to end all aspects, both grid electricity buyers to
purchase unique power plant, it is the only vendor to sell users of
electricity. This vertically integrated monopoly, fundamentally hinder the
development of photovoltaic and other new energy power.