Now when the increasing awareness of environmental protection
and as well as full support for families of small- portable
solar generator construction projects in the country.
Household solar power plant is also one of the most flexible and the most
popular family. Solar power as long as the place where the sunlight can build
their own small home solar power stations. However, after the family built a
small power stations, and to achieve the net, we need to take the seven steps of
the electricity sector.
Home solar power station and network seven-step:
1、
Electric Power Bureau to apply
for the operating room, fill out the application and the network form. (It is necessary
with identity cards and a copy of the head of household, real estate license
and other related documents when families apply.)
2、Home electricity sector survey and issue
personalized and programs of off grid solar system in 10 working days.
3、Family and confirm net programs
4、According to the network solutions, the family
design photovoltaic power stations detailed.
5、In accordance with the relevant technical
requirements to purchase equipment, the average family 5 kilowatts 6 kilowatts
of capacity has been sufficient. Contact a professional for installation.
6、Family raised grid network debugging
application, power companies install metering meter, organizational acceptance,
and signed relevant agreements
7、After testing, the grid network has officially
completed.
Of course solar generator power stations and network
application is free. Completed the individual and the state power grid, the
solar generator can be their own excess electricity sold to the state and get
some appropriate subsidies. Meanwhile make their own cost to recover faster.
In addition for 380 volts and below the solar grid project, the
electricity sector commitment in 35 working days to complete the grid and
network flow;10 KV level and network project commitments in 45 working days to
complete the grid and network processes.