1. Equipment manufacturers comply with the provisions of installation specifications and the necessary application codes and standards.
2. Prepared completamente
Full preparatory work for construction in remote areas is particularly important, we must ensure that all the materials needed to build power plants, equipment, tools, installation drawings and information brought to the scene. Site for a variety of emergency situations that may arise must have the appropriate preparations. Site construction leaders and key personnel should be familiar with the venue, transportation, topography, climate, and human environment, should know how to injured people evacuated as soon as possible. Be sure to prepare a communication tool with the outside world. Bring enough clothes, food and temporary accommodation appliance, which in the wild is very necessary temporary overnight.
3. Reasonable arrangements and strengthen coordination
The installation site of solar generator must be given ample time to work aside to ask, which is particularly important in inaccessible remote areas. Only in this way can calmly work site staff, to avoid in order to finish the work, the phenomenon appears hectic at work and accidents.
Construction project can not be completed on time may cause a lot of problems, such as increased costs. Inconvenience to local users, but also to the installers trouble. To install work smoothly requires a reasonable time, at the same time pay attention to the coordination of the progress of work solar backup generator . Whenever the next step before installation, all the necessary preparatory work must be done according to the requirements.
4. Prepare construction drawings and technical documents
Site preparation and placement of equipment must be accountable to all construction workers clear the site of all buildings, foundations, cable trenches, pipes, cable laying paths and walls and so must be accurately marked on construction plans and technical detailed log file.
5. Enhanced environmental awareness, the use of new materials and new technology
Stand-alone PV power plant built in remote areas generally untapped, near agricultural areas or water. Unreasonable installation may result in water pollution and damage to crops, livestock and even affect wildlife survival. The installer of off grid solar system should have the basic knowledge and understanding of environmental protection of certain hazardous substances. Note the use of new materials and new technology emerging as an alternative to harmful traditional materials and old craft.
All the people must remember that, in the power engineering construction, there is always the potential danger and insecurity, time can’t be taken lightly. Throughout the installation of photovoltaic solar energy storage and the installation is completed to ask the inspection process, we must carefully check each part of the system to ensure the safe operation of power plants and the safety of nearby residents or pedestrians construction workers.
Stand-alone photovoltaic systems are often
located in remote areas, so the design and installation work will encounter
difficulties such as transport, installation materials and other aspects. When
designers or installers in planning the installation of photovoltaic systems in
remote, should be planned and ready to install the tools and materials needed.
It may not have specialized electrical shop near the remote installation site,
so well-planned pre-construction is necessary. Due to the specific
circumstances of each construction site is different, the installer should
first examine the site before construction, detailed study should be required
to list the tools and materials of off grid solar system.